Skip to content
0121 643 8729
  • Projects
    • Birmingham Eastside Metro Extension
      • A History of Digbeth
    • Birmingham Westside Metro Extension Phase One – Centenary Square
    • Birmingham Westside Metro Extension Phase Two – Edgbaston
      • Five Ways Underpass Closure
    • East Birmingham to Solihull Metro Extension
    • Wednesbury To Brierley Hill Metro Extension
    • Wolverhampton City Centre Metro Extension
    • Bilston Road Track Replacement
  • About Us
    • About Us
    • Awards & Accreditations
    • A History of Birmingham Trams
  • News & Media
    • News & Media
    • Publications
    • Media Enquiries
  • Our Culture
    • Supply Chain
    • Health and Safety
    • Sustainability
  • Careers
  • Connecting Futures
    • Personalised Career Advice and Guidance
  • Contact
    • Sign up for updates
    • West Midlands Metro
    • Financial Assistance Package

Category: Wolverhampton City Centre Extension

Midland Metro AllianceWolverhampton City Centre Extension

Passenger services moving closer as driver familiarisation set to begin for new Wolverhampton route

Posted by Fraser Sutton on 24 August, 2023

Tram services to Wolverhampton’s new integrated transport gateway are set to begin in coming weeks following the handover of the … Read more

First tram runs on new Metro route as testing and commissioning underway in Wolverhampton

Posted by Antony Lowbridge-Ellis on 4 April, 2023

A tram travelled along Pipers Row and Railway Drive for the first time last night as testing for the Wolverhampton … Read more

Wolverhampton City Centre Metro extension gearing up for testing and commissioning as resurfacing activities planned in Pipers Row next month

Posted by Fraser Sutton on 21 March, 2023

The Wolverhampton City Centre Metro extension moves closer to operation as it was announced that the final works on Pipers … Read more

Final stages of the Wolverhampton City Centre Metro extension to begin in March 2022

Posted by Antony Lowbridge-Ellis on 1 March, 2022
Metro services will begin calling at a new Metro stop in Wolverhampton later this summer

The Wolverhampton City Centre Metro … Read more

Road users in Wolverhampton advised to plan ahead as Metro works take place on St Georges Parade

Posted by Fraser Sutton on 23 October, 2021

Motorists are being advised to plan-ahead and use real-time travel information as additional works for the Wolverhampton City Centre Metro … Read more

Milestone celebrated as first section of tram track installed outside Wolverhampton Railway Station

Posted by Fraser Sutton on 20 September, 2021

A milestone has been celebrated on the Wolverhampton City Centre Metro extension following the successful installation of the first stretch … Read more

Concrete pour on the Wolverhampton City Centre Metro extension signals continuing progress

Posted by Fraser Sutton on 4 August, 2021

3 August 2021

A significant concrete pour has taken place on Railway Drive in Wolverhampton for the Metro extension which … Read more

Doors open to second half of new Wolverhampton Railway Station

Posted by Fraser Sutton on 28 June, 2021

Monday 28 June 2021

The second half of Wolverhampton’s new Railway Station has today (Monday) opened to the public.

Following … Read more

Final stages of construction to get underway for Wolverhampton City Centre Metro extension

Posted by Fraser Sutton on 12 March, 2021

12 March 2021

The Wolverhampton City Centre Metro extension will move closer to completion when the final stages of construction … Read more

Phase one of new railway station close to completion

Posted by Fraser Sutton on 17 December, 2019

A date for the opening to the public of phase one of City of Wolverhampton’s new railway station will be … Read more

Posts navigation

1 2 … 4 Next →

Twitter Feed

Contact Us

Midland Metro Alliance,
16 Summer Lane,
Birmingham B19 3SD
01216438729
General Enquiries
Media Enquiries
@midlandtram
Facebook
Linkedin

Enter keyword or phrase & press enter

Accreditations

Midland Metro Alliance © 2022
X
X